This was a project that had its challenges that we overcame with working closely with our design team and our client. all materials had to be taken from the front of the building and brought through internally to be built at the back of the property. This required a bespoke design as the structure had to be built over a glass roof with offices below, the whole project was erected and dismantled with little or no interruption to the surrounding business and completed on schedule